
Page Two
10-10-2008: The pre-fabricated concrete walls are going up...BIG TIME!
One big erector set! Big Boy Toys.
Ground floor walls are up. Next: pour the ground floor, then start on the second story the same way.
Proceed to: Page Three
Page One | Page Two | Page Three | Page Four | Page Five | Page Six
| Page Seven | Page Eight | Page Nine | Page Ten | Page Eleven | Page Twelve | Page Thirteen
Page Fourteen | Page Fifteen | Page Sixteen
Return to the INDEX page